Who it is for: for founders and product teams whose idea has outgrown a template or a patched-together prototype.
The goal of a first version (MVP) is not to do everything. It is to test your most important assumption with real users. That takes few features, but those features have to work reliably.
The common mistake is a prototype that is built quickly, breaks with every new feature, and that a later team wants to rewrite. This is avoidable if the data model and the structure of the code are sound from the start, even when the feature list is short.
A working application running in production that a later development team can take over.
The work runs in two-week cycles. At the end of each cycle you get a version you can try, so you see where the product stands and can still change direction. We prioritise the scope together: whatever the first version does not need moves to later.
A typical schedule: a clickable skeleton by week two, the main features by weeks four to six, test users by weeks eight to ten, and launch in week twelve.
Proven, widely used tools: TypeScript, a Next.js or Nuxt front end, a Laravel or Node.js API, PostgreSQL, CI/CD and containerised operations. Developers for these are easy to find, which matters more for the future of your product than whichever framework is fashionable.
A free 30-minute conversation, followed by a written proposal with a fixed price or hourly rate.
A version you can try every two weeks, so the direction can still change along the way.
Your team tries it out, and we only go live once the agreed conditions are met.
30 days of free bug fixing, then an optional maintenance package.
A version you can show customers typically takes 6–12 weeks, and the full system 3–6 months, depending on scope.
The price depends on the scope of the product, so I do not quote a figure up front. After the free 30-minute consultation you get a written proposal with a budget fixed in advance.
The code and all access live in your accounts and the system is documented, so an experienced developer can take it over in a few days.
That is what the two-week cycles are for: we re-prioritise at the end of each cycle, so a change does not derail the project.
What an MVP is, how long and how much it takes, what to put into the first version and what to leave out, so you reach real users fast.
Read article →SaaS development step by step: validation, MVP, architecture (multi-tenancy, payments), technology, and the most common mistakes to avoid.
Read article →Laravel vs Node.js/TypeScript: which to choose for a business system, SaaS or API? An honest comparison for decision makers, without the jargon.
Read article →When is a dedicated software engineer better, and when an agency? An honest comparison of cost, communication, accountability and scalability.
Read article →